Timetable for signing contract at Ministry of health to professionals registered for the residential village construction by Dashen bank, MOH, and Gojo bridge housing

Timetable for signing contract at Ministry of health to professionals registered for the residential village construction by Dashen bank, MOH, and Gojo bridge housing , February 20 2023

 

.

.

.

Introduction about the program

.

 

 

This video elaborates responsibility of FMOH, Dashen Bank and Gojo bridge housing based on the agreement to build a residential village for health professionals.

– Mr Aseged Samuel (Ministry of Health Human resource director)

– Mr Aga Fufa (በጎጆ ብሪጅ ሀውሲንግ የማህበራት ማደራጃ ቡድን ሀላፊ)

– Dashen bank senior manager, small and medium scale enterprise

– Mr Thomas Gashaw ( Gojo bridge housing marketing team leader and G Mark’s CEO)

 

You can watch the video on youtube using the link below

Watch on YouTube 

.

Requirements

.

 

This video elaborates the requirements that need to be fulfilled for health participants who to participate in the housing program

– Mr Aseged Samuel (Ministry of Health Human resource director)

– Mr Aga Fufa (በጎጆ ብሪጅ ሀውሲንግ የማህበራት ማደራጃ ቡድን ሀላፊ)

– Dashen bank senior manager, small and medium scale enterprise

– Mr Thomas Gashaw ( Gojo bridge housing marketing team leader and G Mark’s CEO)

You can watch the video on youtube using the link below

 

Watch on YouTube

.

 

Timetable for signing contract at Ministry of health to professionals registered for the Gojo bridge housing programTimetable for signing contract

.

Timetable for signing contract at Ministry of health to professionals registered for the residential housing program by Dashen bank, MOH, and Gojo bridge housing.

 

.

 

For more related post alerts join us on Telegram 

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top